Make Your Property
The Talk Of The Town

Discover Quality Flooring Installment Services

Whether you’re seeking residential or commercial flooring installment services, our company will provide expert guidance and support to help you achieve your goals and transform your space.

Works

Projects We Have Done

Frequently Asked Questions

How long will my flooring installation take?

This will depend on the type of flooring being installed and the size of the room. Most flooring projects are finished within 1-3 days. This does not include time to get new flooring acclimated to your home if needed.

How much will my flooring cost?

this will vary depending on materials and amount of flooring being installed. our team can provide you an estimate that fits your budget and preferences.

What is the process of acclimating hardwood flooring?

New hardwood flooring needs to be acclimated to the temperature and humidity of the room it is being installed in. Hardwood flooring needs to be placed in the room raised off the floor for 5-7 days to get acclimated. With engineered hardwood flooring this is not required.

What is the difference between laminate and luxury vinyl?

While laminate flooring and luxury vinyl look similar, these materials have a few key differences. Luxury vinyl is waterproof, making it versatile and an excellent option for any room. Laminate flooring usually has a fiberboard core, which makes it susceptible to damage from water. Laminate tends to look more natural than vinyl because it is made of more natural materials.

How do i prepare for flooring installation?

Before installing flooring, you will want to have the room ready by moving all furniture out of the room or to one side, removing anything on the floor, curtains, and wall hangings.